Series 1: Law Library: Oversized Map Case Drawer 6

Source Item Title Description (Revision No. Symbol, Description, Date) Date Identifier Location
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase 1 Library, Site Layout, Grading and Utility Plan PCD #9, Symbol 9, Revise Walkway Layout and Grades. Adjust Trash enclosure grades and remove tree. Revise wall location to clear existing emh. Date 12/17/81. PCD #5, Symbol 5, Delete metal beam guardrail and post. Add 4'-0" high chain link fence, gates and new trash enclosure. 12-17-81; PCD #5, Symbol 5, Delete metal beam guardrail and post. Add 4'0" high chain link fence, gates and new trash enclosure. 8-7-81; PCD #2, Symbol 2, Revise planter walls & slope grading, drainline, chiller pad location. Install guardrail. Delete service drive & appurtenances, bridge, 4" waterline along quarry rim. Date 6-2-81; ADD-2, Symbol 2, Add guardrail note & temporary fencing note relocate waterline at bridge X-ing. Revise chiller cooling tower enclosure pad elev. Revise grouting limits add bridge layout dimensions. Added limits of grading; water consumption figures; signature block.Date 1-16-81 12/1980 C-3, 4 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase 1 Library, Site Layout, Grading & Utility Plan PCD #5, Symbol 5, Delete metal beam guardrail and post. Add 4'0' high chain link fence, gates and new trash enclosure. 8-7-81; PCD #2, Symbol 2, Revise planter walls & slope grading, drainline, chiller pad location. Install guardrail. Delete service drive & appurtenances, bridge, 4" waterline along quarry rim. Date: 6-2-81; Add-2, Symbol 2, Add guardrail note & temporary fencing note relocate waterline at bridge X-ing. Revise chiller cooling tower enclosure pad elev. Revise grouting limits add bridge layout dimensions. Added limits of grading; water consumption figures; signature block. Date: 1-16-81 12/1980 C-3, 4 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Site Layout, Grading & Utility Plan PCD #2, Symbol 2, Revise planter walls & slope grading, drainline, chiller pad location. Install guardrail. Delete service drive & appurtenances, bridge, 4" waterline along quarry rim. Date: 6-2-81; Add-2, Symbol 2, Add guardrail note & temporary fencing note relocate waterline at bridge X-ing. Revise chiller cooling tower enclosure pad elec. Revise groutin limits add bridge layout dimensions. Added limits of grading; water consumption figures; signature block. Date: 1-16-81. 12/1980 C-3, 4 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Site Layout, Grading & Utility Plan Add-2, Symbol 2, Add guardrail note & temporary fencing note relocate waterline at bridge X-ing. Revise chiller cooling tower enclosure pad elev. Revise grouting limits. Add bridge layout dimensions. Added limits of grading; water consumption figures; signature block. Date: 1-16-81 12/1980 C-3, 4 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Site Layout, Grading & Utility Plan Handwritten in red: "See Add #2 added guardrail note & temporary fencing note. Relocate [not legible] at bridge crossing, revise(?) chiller cooling (?) enclosure pad (?). Revise(?) grouting limits, add bridge layout dimensions added limits of grading. Water consumption (?)." 12/1980 C-3, 4 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Boring Logs & Notes Add-2, Symbol 2, Added to summary of earthwork quantities. 12/1980 C-4, 5 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Boring Logs & Notes See Add #2. Added to Summary of earthwork quantities. 12/1988 C-4, 5 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Sections and Profiles PCD #9, Symbol 9, Revise Wall Location to Clear Existing EMH, Date: 12/17/81. PCD #2, Symbol 2, Revise drainline, delete 4" Waterline Along Quarry Rim Delete service drive section, Date 6/2/81 12/1980 C-5, 6 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Sections and Profiles See PCD #9. PCD #2, Symbol 2, Revise drainline, delete 4" waterline along quarry rim. Delete service drive section. Date: 6/2/81. 12/1980 C-5, 6 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Sections and Profiles See PCD #2 12/1980 C-5, 6 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Details PCD 39, Symbol 9, Delete Wheelchair ramp add ramp, Date 12/17/81. PCD #2, Symbol 2, Delete Chain Barrier Det. Date: 6/2/81. 12/1980 C-6, 7 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Details See PCD #9. PCD #2, Symbol 2, Delete Chain Barrier Det. Date 6/2/81 12/1980 C-6, 7 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Details See PCD #2. Add #2 Detail 5/C-6. 1. Revise steel pipe rail to 1.5" O.D. 12/1980 C-6, 7 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Landscape, Planting Plan PCD #9, Symbol 9, Relocated Monkeypd wall extension-add 320 ft syngonium, coconut reposition, Date 12/17/81. PCD #7, Symbol 7, Revised planting for Phase II Coordination, Date: 9/23/81. PCD #5, Symbol 5, Trash enc. addition, coconut relocation - delete 1 coco add 2 plumeria. Date 8/7/81. PCD #2, Symbol 2, Revised entry/bridge deletion, Date: 6/2/81. AD #2, Symbol 2, Utility Location and Planting Coordination, Date 1/16/81. 12/1980 L1, 8 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Landscape Planting Plan See PCD #9. See PCD # 7, Symbol 7, Revised planting for Phase II Coordination, Date 9/23/81. See PCD #5, Symbol 5, Trash Enc. Addition, Coconut relocation-delete 1 coco add 2 plumeria. PCD #2, Symbol 2, Revised entry/bridge deletion, Date 6/2/81. AD-2, Symbol 2, Utility location and planting coordination, Date 1/16/81. 12/1980 L1, 8 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Landscape Planting Plan See PCD #9. PCD-5, Symbol 5, Trash Enc. Addition, Coconut relocation-delete 1 coco add 2 plumeria. PCD-2, Symbol 2, Revised entry/Bridge deletion, Date 6/2/81. AD-2, Symbol 2, Utility Location and planting coordination, Date 1/16/81. 12/1980 L1, 8 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Landscape Planting Plan See PCD #5, PCD-2, Symbol 2, Revised entry/bridge deletion, Date: 6/2/81. AD-2, Symbol 2, Utility Location and Planting Coordination, Date 1/16/81. 12/1980 L1, 8 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Landscape Planting Plan See PCD #2. AD-2, Symbol 2, Utility Location and Planting Coordination. Date 1/16/81. 12/1980 L1, 8 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Landscape Planting Plan See Add #2 Utility Location and Planting Coordination. 12/1980 L1, 8 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Landscape Irrigation Plan PCD-9, Symbol 9, Planter Wall extension-add 11 heads, respacing of heads. Date 12/17/81. PCD-7, Symbol 7, Revised system for phase II coordination, Date 9/23/81. PCD-5, Symbol 5, Trash enc. addition - delete 1 head, coconut relocation. Date, 8/7/81. PCD-2, Symbol 2 - Revised entry-bridge deletion (add 5 heads), 6/2/81. Ad-2, Symbol 2, Add 2 heads, Date 1/16/81. 12/1980 L2, 9 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Landscape Irrigation Plan PCD-7, Symbol 7, Revised system for Phase II coordination. Date 9/23/81. PCD-5, Symbol 5, Trash Enc. addition-delete 1 head, coconut relocation. Date 8/7/81. PCD-2, Symbol 2, Revised entry-bridge deletion (add 5 heads), Date 6/2/81. AD-2, Symbol 2, Add 2 Heads, Date 1/16/81. 12/1980 L2, 9 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Landscape Irrigation Plan See PCD #9. PCD-5, Symbol 5, Trash enc. addition-delete 1 head, coconut relocation, Date 8/7/81. PCD-2, Symbol 2, revised entry- bridge deletion (add 5 heads), Date 6/2/81. Ad-2, Symbol 2, Add 2 heads, Date: 1/16/81. 12/1980 L2, 9 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Landscape Irrigation Plan See PCD #5, PCD-2, Symbol 2, Revised entry-bridge deletion (add 5 heads), Date 6/2/81. AD-2, Symbol 2, Add 2 heads, Date 1/16/81. 12/1980 L2, 9 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Landscape Irrigation Plan See PCD #2, AD-2, Symbol 2, Add 2 Heads, Date 1/16/81. 12/1980 L2, 9 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Landscape Irrigation Plan See Add #2, Add Heads. 12/1980 L2, 9 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" Library, Floor Plan, Roof Plan PCD #9, Symbol 9, Revise Wall location, Date: 12/17/81. PCD #2, Symbol 2, Revise entry, Date: 6/2/81. 12/1980 A-1, 10 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" Library, Floor Plan, Roof Plan See PCD #9, PCD #2, Symbol 2, Revised Entry Area, Date: 6/2/81. 12/1980 A-1, 10 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" Library, Floor Plan, Roof Plan See PCD #2 12/1980 A-1, 10 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Bldg "A" - Library, Floor Plan & Column Types PCD #2, Symbol 2, Revised etnry area, Date: 6/2/81. ADD #2, Symbol 2, Revise entry, Date 1/16/81. 12/1980 A-2, 11 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Bldg "A" - Library, Floor Plan & Column Types See PCD #2. Add #2 Detail A/A-2. 1. Add door designation D-3 to door between circulation and controlled entry. 2. Add door designation D-1 and D-2 as shown on sheet A-20 window types. Add #2, Symbol 2, Revise Entry, Date 1/16/81. 12/1980 A-2, 11 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Bldg "A" - Library Floor Plan & Column Types See Add #2, Revise Entry 12/1980 A-2, 11 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Bldg "A" - Library, Floor Plan & Column Types PCD #2, Symbol 2, Delete trash enclosure, Date 6/2/81. 12/1980 A-3, 12 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Bldg "A" - Library floor plan & Column Types See PCD #2 12/1980 A-3, 12 of 59. Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Room Finish schedule, Area Tabulation PCD #9, symbol 9, Revise trash enclosure detail, Date 12/17/81. PCD #5, Symbol 5, Add trash enclosure, Date 8/7/81. PCD #2, Symbol 2, Delete bridge, Date 6/2/81. 12/1980 A-4, 13 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Room Finish schedule, Area Tabulation See PCD #2, PCD #5, Symbol %, Add Trash enclosure, Date: 8/7/81. PCD #2, Symbol 2, Delete bridge, Date 6/2/81 12/1980 A-4, 13 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Room Finish schedule, Area Tabulation See PCD #5, PCD #2, Symbol 2, Delete bridge, Date 6/2/81. 12/1980 A-4, 13 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Room Finish Schedule, Area Tabulation See PCD #2. Add #2. 1. Room A-105, stack space-omit vinyl asbestos flooring. 2. Room A-122, entry-omit ceramic tile base and add concrete base. 3. Rooms A-101, A-102, A-103, A-100A, A-100., A-104, A-105, A-106. Add gyp. bd. ceiling. 4. Room A-121 Intensive book storage - omit concrete flooring and add vinyl asbestos flooring. 5. ooms A-100, A-105, A-105A add vinyl wall covering. 12/1980 A-4, 13 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Bldg "A" Library Reflected Ceiling Plan PCD 11, Symbol 11, Clarification DWG. Ceiling conditions, Date 2/6/82. 12/1980 A-5, 14 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities Phase I Library, Bldg "A" - Library Reflected Ceiling Plan. Add #2, Detail A/A-5. 1. Add light fixtures in entry cement plaster soffit as shown in detail 1/E-4. 1. See detail 1/E-4 for revised grid layout in cove ceiling. 2. See detail 1/E-5 for revised grid layout in cove ceiling between column a and B from 5 through 15. 12/1980 A-5, 14 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building A - Library Exterior Elevations PCD 39, Symbol 9, Revise planter wall location, Date 12/17/81. PCD 32, Symbol 2, Revised entry area, Date 6/2/81. 12/1980 A-6, 15 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building A - Library Exterior Elevations See PCD #9. PCD #2, Symbol 2, Revised Entry Area, Date 6/2/81. 12/1980 A-6, 15 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building A - Library Exterior Elevations See PCD #2 12/1980 A-6, 15 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Bldg "A" - Library Interior Elevations, Det. Plan, & Toilet Det. Add #2 Detail E/A-7. 1. Revise bulletin board detail designation to read D/A-17. 12/1980 A-6, 16 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Bldg "A" - Library Interior Elevations. PCD #3, Symbol 3, Clarification, Date 7/6/81. PCD #2, Symbol 2, Revised entry area added detail, Date 6/2/81. Add #1, Symbol 1, Added grooves on interior wall, Date 1/7/81. 12/1980 A-8, 17 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Bldg "A" Library Interior Elevations See PCD #3. PCD #2, Symbol 2, Revised entry area, added detail, Date 6/2/81. Add #1, Symbol 1, Added grooves on interior wall, Date 1/7/81. 12/1980 A-8, 17 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Bldg "A" Library Interior Elevations Add #2. 1. Detail /a/A-8. Elevations "B" and "C" add Vinyl wall covering on gypsum wall board. 2. Detail D/A-8 elevations "B" & "C" and "D" add vinyl wall covering on gypsum wallboard. Add #1, Symbol 1, Added grooves on interior wall, Date 1/7/81. 12/1980 A-8, 17 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Bldg "A" - Library Interior Elevations See PCD #2, See Add #1, Added grooves on interior wall. A/A-8 12/1980 A-8, 17 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Bldg "A" - Library Interior Elevations Add #2, Detail F/A-9. Elevation "B" add vinyl wall covering on gypsum wallboard 12/1980 A-9, 18 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Library Cross and Longitudinal Sections PCD #2, Symbol 2, Revised Entry Area, Date: 6/2/81. 12/1980 A-10, 19 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Library Cross and Longitudinal Sections See PCD 32. Add #2. 1. Detail A/A-10 (a) Revise trench drain detail designation to read E/A22. (b) Omit vision panels in doors to Director and associate offices. 2. Detail B/A-10. (a) Omit carpet detail at ramp. 12/1980 A-10, 19 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Bldg "A" - Library Cross Sections PCD #9, Symbol 9, Revise Planter Wall Location, Date: 12/17/81. PCD #2, Symbol 2, Revised Entry area, Date 6/2/81. 12/1980 A-11, 20 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Bldg "A" - Library Cross Sections See PCD #9. PCD #2, Symbol 2, Revised Entry Area, Date 6/2/81. 12/1980 A-11, 20 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Bldg "A" - Library Cross Sections See PCD #2 12/1980 A-11, 20 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Bldg "A" - Library Wall Section PCD #3, Symbol 3, Clarification, Date 7/6/81. PCD #2, Symbol 2, Revised entry area, added detail, 6/2/81. 12/1980 A-12, 21 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Library wall section See PCD #3. PCD #2, Symbol 2, Revised entry area, added detail, Date 6/2/81. 12/1980 A-12, 21 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Library wall section See PCD #2 12/1980 A-12, 21 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Library wall section PCD #2, Symbol 2, Revised Entry Area, Date: 6/2/81. 12/1980 A-13, 22 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Library wall sections See PCD #2 12/1980 A-13, 22 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Library wall sections PCD #3, Symbol 3, Clarification, Date: 7/6/81 12/1980 A-14, 23 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Buildihng "A" - Library wall sections ADD #2, 1. Omit detail F/A-14, See PCD #3 12/1980 A-14, 23 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Library wall sections and details 12/1980 A-15, 24 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Library skylight detail ADD #2, 1. Detail A/A-16 Section gyp. Bd. to be 5/8", 2. Detail C/A-16 Revise height of overflow drain to read 2" max. Above low point of roof 12/1980 A-16, 25 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Library cabinet details 12/1980 A-17, 26 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Library toilet room, elevator pit, and misc. details 12/1980 A-18, 27 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Library door schedule, types, and details ADD #2, Symbol 2, Revised Door #1, 1. Door D-1 & D-2 omit Hollow Core, 2. Door D-4 & D-5 omit 1/4" plate glass, 3. Door D-8 add 1/4" plate glass, 4. D-24 add "Panic Hardware" remarks, Date: 1/16/81 12/1980 A-19, 28 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Library door schedule, types, and details ADD #2, Revised Door #1 12/1980 A-19, 28 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Library window schedule, types, and details ADD #2, Symbol 2, Revised window Type A and Door 1, Date: 1/16/81 12/1980 A-20, 29 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Library window schedule, types, and details See ADD #2, Revised window Type A and Door 1 12/1980 A-20, 29 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Library bridge plan and sections ADD #2, Symbol 2, Reduce bridge width, revise rail and paver tile pattern, add det. note, Date: 1/16/81 12/1980 A-21, 30 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Library bridge plan and sections See ADD #2, Reduce bridge width, revise rail and paver tile pattern, add det. note 12/1980 A-21, 30 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Library bridge details and temporary stairs ADD #2, Symbol 2, Reduced bridge width, revised water line suppports, rail, Date: 1/16/81 12/1980 A-22, 31 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Library bridge details and temporary stairs See ADD #2, Reduce bridge width revised water line supports rails 12/1980 A-22, 31 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I, Building "A" - Chiller cooling tower enclosure PCD #2, Revised cooling tower enclosure, Date: 6/2/81 12/1980 A-23, 32 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I, Building "A" - Chiller cooling tower enclosure See PCD #2 12/1980 A-23, 32 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Library reflected ceiling fan ADD #2, 1. Add general note to read as follows: "all redwood members shall be pressure impregnated with koppers NCX fire retardant chemicals with a designated rating of FRS or an approved equal furnish U.L. label & certification" 12/1980 A-24, 33 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library - Exterior stair, planter and misc. details ADD #2, 1. Add note to refer stair resin and nose notes similar to detail 5/C-6 12/1980 A-25, 34 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Partial foundation plan and details PCD #2, Symbol 2, Revised entry area, Date: 6/2/81 12/1980 S-1, 35 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Partial foundation plan and details See PCD #2 12/1980 S-1, 35 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Partial foundation plan and details 12/1980 S-2, 36 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - General notes and details 12/1980 S-3, 37 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Partial roof framing plan 12/1980 S-4, 38 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Partial roof framing plan 12/1980 S-5, 39 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Structural details PCD #2, Symbol 2, Revised concrete topping on metal decking, Date: 6/2/81 12/1980 S-6, 40 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Structural details See PCD #2 12/1980 S-6, 40 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Bridge "A" structural details ADD #2, Symbol 2, Reduced bridge width, Date: 1/16/81 12/1980 S-7, 41 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Bridge "A" structural details See ADD #2 Reduced bridge width 12/1980 S-7, 41 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Library chiller plant and diagrams ADD #2, Deleted chem. feed, added CHW bypass line, revised control diag. 12/1980 M-7, 49 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Cooling tower enclosure structural details PCD #2, Symbol 2, Revised cooling tower enclosure, Date: 6/2/81 12/1980 S-8, 42 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Cooling tower enclosure structural details See PCD #2 12/1980 S-8, 42 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Library plumbing floor plan PCD #2, Symbol 2, Revised entry area, Date: 6/2/81 12/1980 M-1, 43 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Library plumbing floor plan See PCD #2 12/1980 M-1, 43 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Library plumbing floor plan 12/1980 M-2, 44 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Library floor plan and diagrams 12/1980 M-3, 45 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Library air conditioning floor plan ADD #2, Added notes, access panels and size ducts 12/1980 M-6, 48 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Library chiller plant and diagrams ADD #2, Symbol 2, Deleted chem. feed, added CHW bypass line, revised control diag., Date: 1/16/81 12/1980 M-7, 49 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Library site plan PCD #2, Symbol 2, Relocated cooling tower and rerouted lines, Date: 6/2/81 12/1980 M-4, 46 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Library site plan See PCD #2 12/1980 M-4, 46 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Library air conditioning floor plan 12/1980 M-5, 47 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Library air conditioning floor plan ADD #2, Symbol 2, Added notes; access panels and sized duct, Date: 1/16/81 12/1980 M-6, 48 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Library piping diag. and equipment schedule PCD #6, Symbol 6, Changed chiller & capacity pipe sizes, Date: 9/2/81. PCD #4, Symbol 4, Revised AH-1, 2, 3, 4, 5 & 9 ESP to TSP, Date: 8/3/81. ADD #2, Symbol 2, Deleted chemical feed, added 6" CHW bypass, change voltage to 4800, Date: 1/16/81 12/1980 M-8, 50 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Library piping diag. and equipment schedule See PCD #6. PCD #4, Symbol 4, Revised AH-1, 2, 3, 4, 5, & 9 ESP to TSP, Date: 8/3/81. ADD #2, Symbol 2, Deleted chemical feed, added 6" CHW bypass, change voltage to 4800, Date: 1/16/81 12/1980 M-8, 50 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Library piping diag. and equipment schedule See PCD #4. ADD #2, Symbol 2, Deleted chemical feed, added 6" CHW bypass, change voltage to 4800, Date: 1/16/81 12/1980 M-8, 50 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Library piping diag. and equipment schedule See ADD #2, Deleted chemical feed, added 6" CHW bypass, change voltage to 4800 12/1980 M-8, 50 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Library sections 12/1980 M-9, 51 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Library details ADD #2, Detail 3/M-10, 1. Reise water line support as shown on detail A/A22 12/1980 M-10, 52 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Library site electrical plan See PCD #2. PCD #1. ADD #2, Symbol 2, Revised site electrical plan, added note, Date 1/16/81 12/1980 E-1, 53 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Library site electrical plan See PCD #2. ADD #2, Symbol 2, Revised site electrical plan, added note, Date: 1/16/18 12/1980 E-1, 53 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Library site electrical plan ADD #2, Symbol 2, Revised site electrical plan, added note, Date: 1/16/18 12/1980 E-1, 53 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Library site electrical plan See ADD #2, Revised site electrical plan, added note. See PCD #2 12/1980 E-1, 53 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Library one line and rise diagram ADD #2, Symbol 2, Revised one line and riser diag., added PNL "SDPA" one line diagram, Date: 1/16/18 12/1980 E-2, 54 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Library one line and rise diagram See ADD #2, Revised one line and rise diag., added PNL "SDPA" one line diagram 12/1980 E-2, 54 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Library lighting fixture schedule PCD #6, Symbol 6, Revised detail #2, Date: 10/6/81. ADD #2, Symbol 2, Revised lighting fixture details, added fixture MTG details, reised diagram, Date: 1/16/81 12/1980 E-3, 55 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Library lighting fixture schedule See PCD #6. ADD #2, Symbol 2, Revised lighting fixture details, added fixture MTG details, reised diagram, Date: 1/16/81 12/1980 E-3, 55 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Library lighting fixture schedule See ADD #2, Revised lighting fixture details, added fixture MTG details, reised diagram 12/1980 E-3, 55 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Library partial lighting plan PCD #1, Symbol 1, Revised TEL riser diag.,Date: 3/24/81. ADD #2, Symbol 2, Revised lighting plan, TEL riser diagram and master clock and program control diag., Date: 1/16/81 12/1980 E-4, 56 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Library partial lighting plan See PCD #1. ADD #2, Symbol 2, Revised lighting plan, TEL riser diagram and master clock and program control diag., Date: 1/16/81 12/1980 E-4, 56 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Library partial lighting plan See ADD #2, Revised lighting plan, TEL riser diagram and master clock and program control diag. 12/1980 E-4, 56 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Library partial lighting plan PCD #3, Symbol 3, Revised Rm A-121 LTG layout, Date: 7/6/81. ADD #2, Symbol 2, Revised lighting plan, elec. Rm and N.L. control diagram, Date: 1/16/81 12/1980 E-5, 57 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Library partial lighting plan See PCD #3. ADD #2, Symbol 2, Revised lighting plan, elec. Rm and N.L. control diagram, Date: 1/16/81 12/1980 E-5, 57 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Library partial lighting plan ADD #2, Revised lighting plan, elec. Rm and N.L. control diagram 12/1980 E-5, 57 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Library partial electrical plan See PCD #10. PCD #9, Symbol 9, Revised book detector connections, Date: 12/17/81. PCD #1, Symbol 1, Revised entry recep and FA location, Date: 3/24/81. ADD #2, Symbol 2, Revised electrical plan, detail and panel schedules, Date: 1/16/81 12/1980 E-6, 58 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Library partial electrical plan PCD #9, Symbol 9, Revised book detector connections, Date: 12/17/81. PCD #1, Symbol 1, Revised entry recep and FA location, Date: 3/24/81. ADD #2, Symbol 2, Revised electrical plan, detail and panel schedules, Date: 1/16/81 12/1980 E-6, 58 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Library partial electrical plan PCD #9, Symbol 9, Revised book detector connections, Date: 12/17/81. PCD #1, Symbol 1, Revised entry recep and FA location, Date: 3/24/81. ADD #2, Symbol 2, Revised electrical plan, detail and panel schedules, Date: 1/16/81 12/1980 E-6, 58 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Library partial electrical plan See PCD #9. PCD #1, Symbol 1, Revised entry recep and FA location, Date: 3/24/81. ADD #2, Symbol 2, Revised electrical plan, detail and panel schedules, Date: 1/16/81 12/1980 E-6, 58 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Library partial electrical plan See PCD #1. ADD #2, Symbol 2, Revised electrical plan, detail and panel schedules, Date: 1/16/81 12/1980 E-6, 58 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Library partial electrical plan See ADD #2, Revised electrical plan, detail and panel schedules 12/1980 E-6, 58 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Partial electrical plan PCD #6, Symbol, Revised mech. equip. conn., Date: 10/6/81. PCD #1, Symbol 1, Revised chiller/cooling tower, Date: 3/24/81. ADD #2, Symbol 2, Revised electrical plans and diagrams, Date: 1/16/81 12/1980 E-7, 59 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Partial electrical plan See PCD #6. PCD #1, Symbol 1, Revised chiller/cooling tower, Date: 3/24/81. ADD #2, Symbol 2, Revised electrical plans and diagrams, Date: 1/16/81 12/1980 E-7, 59 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Partial electrical plan See PCD #1. ADD #2, Symbol 2, Revised electrical plans and diagrams, Date: 1/16/81 12/1980 E-7, 59 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Building "A" - Partial electrical plan See ADD #2, Revised electrical plans and diagrams 12/1980 E-7, 59 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Title sheet & index to drawings 12/1980 T-1, 1 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, General plan PCD #9, Symbol 9, Revise walkway laout, revise wall location, Date: 12/17/81. PCD #2, Symbol 2, Revise chiller pad location and planter wall, delete future facilities servie dr., bridge and applirtenances, Date: 6/2/81 12/1980 C-1, 2 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, General plan See PCD #9. PCD #2, Symbol 2, Revise chiller pad location and planter wall, delete future facilities servie dr., bridge and applirtenances, Date: 6/2/81 12/1980 C-1, 2 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, General plan See PCD #2 12/1980 C-1, 2 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Existing site and demolition plan PCD #2, Symbol 2, Delete demolition of trash enclosure area, add new limits of clearing and grubbing, Date: 6/2/81. ADD #2, Symbol 2, Add guarorail note, revise note on removal of trees along cliff face, Date: 1/16/81 12/1980 C-2, 3 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Existing site and demolition plan See PCD #2. ADD #2, Symbol 2, Add guarorail note, revise note on removal of trees along cliff face, Date: 1/16/81 12/1980 C-2, 3 of 59 Oversized Map Case 6
Series 1: Law Library - Oversized Map Case, Drawer 6 Law School Facilities - Phase I Library, Existing site and demolition plan See ADD #2, Add guarorail note, revise note on removal of trees along cliff face 12/1980 C-2, 3 of 59 Oversized Map Case 6

Law School History Archives